“NI 43-101 Technical Report – Valeriano Project Inferred Resource Estimates, Atacama Region, Chile” was prepared for ATEX Resources Inc. (“ATEX”) by David Hopper C.Geol, with an effective date of November 13th 2020. “NI 43‐101 Technical Report on the Valeriano Project, Atacama Region, Chile” was prepared for ATEX Resources Inc. (“ATEX”) by David Hopper C.Geol, with an effective date of November 25th 2019.